Peritus Fit-out

This was a small project in St Georges Terrace with three parts: separate an existing training room from the kitchenette to produce a board room, alter an office into a small meeting room and construct a screen in reception to separate that area from the open plan offices. The work was carried out over two weeks while Peritus were operating, so we made sure there was as little noise and disruption as possible.

To provide room for a new door into the boardroom, the plywood feature wall in the photo needed to be removed, shortened and replaced,. The finished result looked as though it had never changed. Painting and glazing film was carried out to complete the job, leaving another satisfied client.

This entry was posted in Projects. Bookmark the permalink.